ABS WIND BRASIL at The Brazilian Gear Conference 2021 #BGC2111/10/2021Last week we received the visit of Matt Croson, president of the American Gear Manufacturers…
The 2,5 MW test bench installation in ABS WIND Brazil is entering its final phase. Early November!09/27/2021It’s been a long road, but we’ve already entered the final phase. There is very…
The largest test bench for wind turbines in LATAM has arrived at ABS WIND BRAZIL08/25/2021We can finally announce that the 2.5MW Power Transmission Load Test Rig with the capacity…
ABS continues to expand and strengthen its position in the wind energy industry02/01/2021The company has recently signed a collaboration agreement with MOVENTAS, leading provider of drivetrain technology…
ABS Wind USA achieves ISO 9001:2015 Certification12/20/2020ABS WIND USA, subsidiary of Atlantic Bearing Services (ABS) is proud to announce that it…